March 17, 2014 - Street Committee Meeting

                                     Street Meeting 3/17/14

 

Council Godwin, Hillard, Mackey, Strausbaugh, and Fox

Village Reps. Schwab, Pauley, and King

Villagers Ray, Lavonne Heitger, Dawn Strausbaugh, Cindy Mackey, Mike Radich,

Ryan Swan, Jim and Jen Spivey.

Called to order by Godwin.

Street levy was the first topic:

Fox what were the percentages used for the last levy: Street 60% tree 20% curb gutter   20%.

Trees have been removed.

Godwin over half of the village does not have sidewalks.

Hillard the subway sidewalk needs repaired the problem is the storm sewer is collapsing

Mackey asked if there was an ordinance for sidewalks Godwin didn’t think there was so

we revert back to the ORC.

Fox the main issue is too get the streets fixed.

Godwin asked Pauley to look into who is responsible for the under pass.

Hillard how much the levy will produce $264000

Godwin I think if this is going to cause a no vote having the sidewalks we need to take

them off the levy.

Repair of Amhurst.

Godwin asked the VA to get quotes for reconstruction and resurface of the street.

The crack sealing of streets was discussed.

Hillard asked the VA to look at sealing some of the bad roads.

Godwin ask the VA to look at what Park Ave. will need for repair. And if he could look

into it.

Adjourn 6:32

Submitted by Chairman Dave Godwin